TIMEWELL
Solutions
Free ConsultationContact Us
TIMEWELL

Unleashing organizational potential with AI

ISO/IEC 27001 (ISMS) certification mark (SGS / ISMS-AC)

ISO/IEC 27001:2022 certified Certificate No. JP26/00000255 Scope: Planning, development and operation of SaaS products utilizing AI technology

Services

  • ZEROCK
  • TRAFEED
  • TIMEWELL BASE
  • WARP
  • WARP 1Day
  • WARP NEXT Corporate
  • WARP BASIC
  • WARP ENTRE
  • Alumni Salon
  • WARP for Schools
  • Alumni Ventures
  • FDE
  • AI Consulting
  • EMC GLOBAL

Company

  • About Us
  • Team
  • Why TIMEWELL
  • News
  • Contact
  • Free Consultation

Content

  • Insights
  • Knowledge Base
  • Case Studies
  • Whitepapers
  • Events
  • Solutions
  • AI Readiness Check
  • ROI Calculator

Legal

  • Privacy Policy
  • Manual Creator Extension
  • WARP Terms of Service
  • WARP NEXT School Rules
  • Legal Notice
  • Security
  • Anti-Social Policy
  • ZEROCK Terms of Service
  • TIMEWELL BASE Terms of Service

Newsletter

Get the latest AI and DX insights delivered weekly

Your email will only be used for newsletter delivery.

© 2026 株式会社TIMEWELL All rights reserved.

Contact Us
HomeColumnsZEROCKWriting an RFQ for Machined Parts: The 12 Items a Drawing Misses
ZEROCK

Writing an RFQ for Machined Parts: The 12 Items a Drawing Misses

Published2026-09-20Ryuta Hamamoto
ManufacturingRFQProcurementDrawingsSourcingZEROCK

"I sent the drawing and never got a quote" usually means the shop is stuck on something you did not tell them. Generic RFQ templates stop at part name, quantity, and due date, which is nowhere near enough for a machined part. Here are the 12 items that belong alongside the drawing, plus a form you can send as is.

Writing an RFQ for Machined Parts: The 12 Items a Drawing Misses
Share

Hello, this is Ryuta Hamamoto from TIMEWELL.

"I sent the drawing and the quote never came back."

Buyers and design engineers say this all the time. The assumption is that the shop is busy. More often, the shop is stuck because it cannot answer.

Without a quantity they cannot allocate setup cost. Surface treatment changes the routing. Whether a certificate of conformance is required changes the hours. Whether you supply the material changes the whole shape of the quote. None of that is usually on the drawing.

This piece sets out the 12 items that belong alongside it, and there is a form at the end you can send as is.

The short version:

  • Most non-responses are the shop lacking information it cannot invent
  • Generic RFQ templates stop at part name, quantity, and date. They have no fields for machining
  • Revision, quantity, and date live outside the drawing. Miss these and the enquiry stalls
  • Anything in the remarks box gets skipped. Give each item its own field
  • The more shops you send it to, the more explicit confidentiality needs to be

Twelve things the drawing does not tell them

1. Drawing number and revision. The most important one. Quoting against one revision and then ordering against another is not a rare accident. Write your internal notation as-is — Rev.3, Issue B, whatever you use. When you swap a drawing out, record whether the old one was pulled back.

2. Material and specification. Usually on the drawing, but whether you accept an alternative is not. If the specified grade is out of stock, may they substitute an equivalent, or must they come back and ask? Stating this removes one round trip.

3. Who supplies the material. Do they buy it, or do you send it? If you send it, when, where, and who transports it. If you can also state who owns the yield risk on supplied material, do.

4. Quantity and how it repeats. "Ten pieces" is not enough. Ten once, or ten a month ongoing? Setup allocation changes completely. If repeat business is likely, say so and they can price on that basis.

5. How tolerance is handled. Is general tolerance fine, or are specific features critical? This is also where you say whether you want suggestions for an easier-to-make form. If value engineering proposals are welcome, say so and they will come.

6. Surface treatment. Type, thickness, area, masking. And who accounts for the dimensional change. Whether a dimension is before or after plating is an argument that repeats forever unless it is stated.

7. Heat treatment. Type, hardness, area. Whether extra stock is needed for distortion.

8. Inspection requirements and documents. 100% or sampling. List what you need — inspection reports, material certificates, declarations of non-inclusion for restricted substances. These drive hours directly, so raising them later is the worst option.

9. Target date, and how firm it is. Not just a date: is it movable or not? If it is not, give the reason — the customer's line start, say — and the priority comes across.

10. Packaging and delivery point. Packing spec, destination, whether partial shipments are acceptable. The bigger the quantity, the more this matters.

11. Items you are providing. Beyond material: fixtures, components, gauges. And whether they are on loan or consumed.

12. Confidentiality. If an NDA exists, state it with its date. If not, state that the drawing is for quotation purposes only and may not be disclosed to third parties. Most important when the same drawing is going to several shops.

Nobody reads the remarks box

Some people put all twelve into a remarks field. Do not do this.

The receiving side looks at the drawing first, then hunts for quantity and date. The remarks box comes last, if at all. Long remarks in particular get skimmed past.

Give each item a field, and write "none" where it does not apply. Make "not stated" distinguishable from "not required." That alone cuts the back-and-forth substantially.

For the same reason, avoid putting conditions in the email body. Emails get forwarded, quoting breaks, and when the contact changes it is gone. Put it on one sheet and send it with the drawing.

Struggling with AI adoption?

We have prepared materials covering ZEROCK case studies and implementation methods.

Book a Free ConsultationDownload Resources

Competitive bids need extra care

When the same drawing goes to several shops, a few more things apply.

Give everyone the same conditions. Obvious, and yet a verbal clarification to one supplier happens easily. Do that and the comparison is void.

State a response deadline. Without one, the replies do not arrive together.

Be explicit about confidentiality. A competitive bid means the same drawing goes to several companies. Make sure the internal risk of sending drawings to a party you have no NDA with is understood. Drawings carry design know-how.

Tell the losers. Not replying to a shop that spent hours on a quote costs you next time.

There is more on the rights side in drawings, AI, and the trade secret boundary.

The buyer's paperwork has legal requirements too

One more practical point, specific to Japan.

When you actually place the order after the quote, the buyer has an obligation to issue written terms. The content of the work, the subcontract price, the payment date and method and other items are prescribed, and the documents must be created and retained. The retention period for transaction records is two years1.

The amendment that took effect on 1 January 2026 added "dies and similar tooling other than metal moulds" to the scope of manufacturing subcontracting — specifically wooden patterns, workholding fixtures, forming dies, and dedicated special tooling. Previously only metal moulds were covered2. If you have fixtures made outside, check whether your transactions now fall inside.

The same material also addresses storing tooling at no charge. Tooling you have not ordered against for over a year, where the supplier has asked to scrap or return it, where you cannot indicate an order window for the coming year, and where there is no plan to reuse it — continuing to have that stored for free can be a problem. Even where the supplier owns the tooling, if the buyer effectively controls it, the same treatment applies2.

Settling who holds tooling and fixtures at the RFQ stage prevents a lot of this later.

The form

There is an RFQ form for machined parts laying out these 12 items in Excel, ready to send.

It is built so that fields do not stay blank — where an item does not apply you pick "none", so the receiving side can tell the difference between an oversight and a genuine non-requirement. For competitive bids you swap the addressee and the deadline and reuse it.

The download link is at the end of this article.

Five of the twelve are already in the drawing

A short word about our product.

Of the items above, material, tolerance, surface treatment, heat treatment, and inspection requirements are all drawn on the print already. Whoever writes the RFQ is copying them across. A few minutes per enquiry, which in a busy purchasing department adds up — and every transcription is a chance to get a digit wrong.

Our enterprise AI, ZEROCK, helps by reading those items off the drawing and drafting the request. What the person does is fill in what is not on the drawing — quantity, date, supply split, confidentiality — and check the extraction.

As always, this assumes the form already exists. Automating into an undefined format gives the output nowhere to go. Settle the form first.

There is more on quoting from drawings in quoting from drawings, and on time build-up in estimating machining time.

In summary

  • Quotes stall mostly because the shop lacks information it cannot invent
  • Twelve items belong with the drawing. Revision, quantity, and date are outside it
  • The remarks box does not get read. Use fields, and write "none" where it does not apply
  • Competitive bids need equal conditions, a deadline, explicit confidentiality, and a reply to the losers
  • Order paperwork has prescribed content and a two-year retention period; from January 2026 fixtures and wooden patterns are in scope
  • What is drawn on the print can be extracted into a draft — but decide the form first

If you want help building an RFQ format, or extracting from drawings, get in touch.

References

Footnotes

  1. Leaflet on the Act on Ensuring Appropriate Transactions in Manufacturing Subcontracting (Japan Fair Trade Commission, August 2025, Japanese). The prescribed content of order documents and the two-year creation and retention obligation come from this material ↩

  2. Key points of the amendment (SME Agency, briefing material, 14 October 2025, Japanese). The addition of dies and tooling other than metal moulds — wooden patterns, workholding fixtures, forming dies, dedicated special tooling — effective 1 January 2026, and the treatment of no-charge tooling storage, come from this material ↩ ↩2

This article was produced with the help of AI. A human verified the primary sources and edited the text before publication.

Ready to optimize your workflows with AI?

Take our free 3-minute assessment to evaluate your AI readiness across strategy, data, and talent.

Book a Free Consultation
Book a Free Consultation45-minute online sessionDownload ResourcesProduct brochures & whitepapers

Share this article if you found it useful

Share

Newsletter

Get the latest AI and DX insights delivered weekly

Your email will only be used for newsletter delivery.

Related Knowledge Base

Enterprise AI Guide

Solutions

Solve Knowledge Management ChallengesCentralize internal information and quickly access the knowledge you need

Learn More About ZEROCK

Discover the features and case studies for ZEROCK.

Contact UsView ZEROCK Details

Related Articles

A 30-Point Drawing Check List: Stop Misses With Process

A 30-Point Drawing Check List: Stop Misses With Process

When drawing review lives in one person's head, the veteran spots a problem in five minutes and the junior engineer misses the same thing three releases in a row. That is a process gap, not an attention gap. Here are 30 checks grouped into dimensions, tolerance, manufacturability, procurement, and compliance, with a sheet you can sign off and keep.

2026-09-20
How to Run a Price Negotiation: From Cost Inventory to a Four-Category Request

How to Run a Price Negotiation: From Cost Inventory to a Four-Category Request

In Japan, 90.7% of small suppliers now get a price negotiation. Only 54.2% of the increase actually passes through. The bottleneck is no longer access to the table, it is what you bring to it. Here is the four-category structure the JFTC guideline sets out, why you should not hand your cost sheet to the buyer, and four ways to build the number you ask for.

2026-09-22
How Long to Keep Drawings: Checking the 10-Year Rule Against the Statute

How Long to Keep Drawings: Checking the 10-Year Rule Against the Statute

Everyone says drawings are kept for ten years, but no Japanese statute sets a retention period for drawings as such. The ten years is worked backwards from the Product Liability Act. Transaction records run two years under subcontracting law and books run seven under the Corporation Tax Act. Here is the statutory basis for each, plus a retention register you can hand an auditor.

2026-09-20
How to Estimate Machining Time: Setup, Cut, Measure, Rate

How to Estimate Machining Time: Setup, Cut, Measure, Rate

Search for machining time estimation and you get cutting-condition formulas. But a quote does not need spindle speed. It needs setup plus cut plus inspection, converted into hours and multiplied by a charge rate. Here is how to build that up operation by operation, and how to turn it into something you can show a customer.

2026-09-20
Nesting and Yield: What Really Sets Your Material Cost

Nesting and Yield: What Really Sets Your Material Cost

Dividing part area by sheet area does not give you a material cost. Web width, clamp deadzone, kerf, and the standard sheet size decide how many parts come off a sheet, and that number is what sets the cost per piece. Here is how to calculate yield properly, with a sheet you can show a customer.

2026-09-20
Twelve Checks When a Customer Drawing Arrives

Twelve Checks When a Customer Drawing Arrives

Push a customer-supplied drawing straight to the floor and you get the classic failures: building to a superseded revision, working around an instruction nobody could read, missing a return obligation. Here are the twelve things to check between receipt and start, plus a receipt register. Revision and confidentiality are the two that slip most.

2026-09-20